Preparing the Ground for Success

Preparing the Ground for Success

Kingsheath Construction provides a comprehensive earthworks and enabling works service, critical for setting a project up for success. As a leading earthworks contractor in Kent, we manage the entire process of site preparation, from initial clearance and ground modelling to final platform readiness. Our expertise ensures that your site is prepared on time, within budget, and to the exact engineering specifications required.

We leverage a modern, GPS-guided fleet of plant and a highly skilled team to deliver optimised, cost-effective solutions that minimise waste and maximise the value of on-site materials, preparing a solid foundation for the subsequent construction phases.

A Foundation of Comprehensive Site Preparation

We offer an integrated package to prepare any site for development, no matter the scale or complexity.

Your Partner for Value-Engineered Earthworks in the South East

Delivering successful earthworks projects requires a combination of specialist machinery, technical knowledge, and meticulous planning. Our service is defined by:

  • Advanced Technology: We utilise the latest GPS machine control technology on our plant. This ensures unparalleled accuracy in achieving design levels, enhances productivity, and reduces the need for traditional setting-out.
  • Value Engineering: Our experienced team reviews site plans to identify opportunities for value engineering, such as optimising cut and fill balance or maximising the reuse of materials to save our clients time and money.
  • Safety and Control: All our operations are executed under strict safety protocols, overseen by our dedicated health and safety management. We ensure a safe, organised site from the very start of the project.
  • Environmental Focus: We operate in full alignment with our ISO 14001 accreditation, carefully managing our works to protect the local environment, control dust and noise, and minimise our carbon footprint.

Our Projects

Our current portfolio for various housing developers demonstrate our versatility and capabilities to deliver on a wide and varying range of projects.

Church Lane, Newington

Church Lane, Newington

Client: Fernham Homes

Project Overview: Located in the heart of the scenic Kent village of Newington, this 90-unit residential development for Fernham Homes represents a significant civil engineering and groundworks undertaking. Kingsheath Construction was appointed to deliver a comprehensive suite of infrastructure and substructure works, ensuring the site was expertly prepared for the construction of high-quality 2, 3, and 4-bedroom family homes. The project required a strategic approach to site logistics and community integration, including complex Section 278 and Section 50 works to enhance local highway connectivity. From the initial topsoil strip to the final soft landscaping and external finishes, our team has maintained a commitment to precision, safety, and the high standards expected by Fernham Homes.

Contract Value: £7,000,000

Commenced: July 2026


Project Description

Whether continuing on from demolition or enabling works, or undertaking a new build project which we can commence as Principle Contractor, we offer the full Groundwork’s package with experience in all types of foundations and piling methods, continuing up to substructures and oversites, drainage, services and external finishes.


Testimonials

We take immense pride in the work we do, but nothing speaks louder than the words of our valued clients.

Kingsheath Construction Limited setting the standards very high and some great safety protocols on show.


Vistry Group, Regional Build Director

I recently visited site and on both occasions the presentation was excellent. I was impressed by the site set up and the quality of the workmanship. This is backed up by the reports from Health and Safety Manager's inspections, the results of which have been exceptional.


Fernham Homes, Managing Director

Kingsheath Construction Limited have done an amazing job at setting up site as PC on a 456 unit scheme. It was great to see so many positive initiatives being applied.


Barratt David Wilson (Kent), Construction Director